Steps along the way
For more clinic construction pictures, please click on Clinic Construction photo album on far right.
January 20, 2010: Clinic framing almost complete
January 1, 2010: Clinic walls raised
December 27, 2009: Clinic subfloor installed
December 16, 2009: Clinic foundation blocks set
November 4, 2009: Clinic foundation blocks assembled and ready to go!
October 6, 2009: Clinic foundation is laid
David Nichols, MD adds his imprint.
September 11, 2009: Construction contract signed
At White Stone Family Practice: (from left) Brian Delawder, Exec. VP, Southern Builders, Inc. (SBI); Steve Hentschel, General Manager, SBI; Don Smith, Chief Estimator, SBI; David Jones, Connemara Construction; Teresa Bush, Office Manager, Connemara Construction; David Annis, Accomack-Northampton Planning District Commission; Jimmie Carter, Chairman, TIHF; Robert Nelson, President, EDA Engineering Design Associates; Dr. David Nichols. (Photo by: Inez Pruitt)
Same day: Dr. Nichols delivers contract to Tangier for signing by Mayor James “Ooker” Eskridge.
(Photo by: Inez Pruitt)
July 24, 2009: Bid opening
Tangier clinic bid opening (from left) Dr. David Nichols, TIHF Board Member + Jimmie Carter, Founder.
(Photo by: Richard Crumbacker, Crisfield Times)
March 24, 2009: Soil testing begins Drill rig arrives at clinic building site; engineers bore holes and take soil samples for testing. Test results will determine the type of foundation to be laid for the new clinic.